Thursday, January 10, 2008

Construction Update # 10

Fresh concrete is being poured this week to all the stadium structures.

Closeup of the freshly poured concrete

Great looking shot of the entire stadium structure with the poured concrete.


This is a great shot contrasting the stadium structure that has the concrete poured.

This is the last movie house that is empty. Work will begin on installing the stadium seating structure and concrete pouring this week.

Drop ceiling being installed in the hallways.


The drop ceiling was installed in the bathroom this week.

The bathrooms are nearly done.


The hallway received a fresh coat of primer.


More equipment arrived this week; these boxes contain brand new projector equipment!


The rails leading up to the upstairs office were installed this week.