Monday, October 22, 2007

Construction Update # 6

Brand new pieces of sound equipment arrived this week!

Neat looking shot at the completed duct work in the lobby area.


Duct work was completed this week

Great shot of the huge lobby area. Dry wall work is complete in this area.

The dry wall work is nearly complete. All that's left is this little section at the entrance.

This is a great shot showing the completed dry wall work in the lobby.


Freshly poured concrete outside the entrance to the new cinema

Work on the new fire escape and outside stairs

When finished this will be a fire escape from the upper level of the cinema

The new sign should arrive soon!

The city of Norton is fixing the streets along the entire shopping center. It will no longer be a car threating experience to enter the shopping center. A big thank you to the city of Norton!



Another look at the sidewalk that is being totally redone.

Tuesday, October 2, 2007

Construction Update # 5 PART 2

This is where one of the exit signs will hang

Mack, the cinema projection specialist, works with Mike on the new cinema

This red string is used to adjust the line of sight from the movie projector to the screen


Another look at the line of sight. This time from the bottom of the theater


The stairs are getting hand rails installed

Sunday, September 30, 2007

Construction Update # 5



A last minute change of plans has turned this area into a party room where kids will enjoy a memorable birthday party!

Another look at the new party room for kids Birthdays and cinema parties!

A view of the doors from inside the new cinema

New doors were installed this week. Big Stone Glass handled the glass install.

New masonry finished this week to partially enclose the front


Abingdon Roofing is putting matching trim around the entire building.




Wednesday, September 19, 2007

Construction Update # 4 PART 2

Walls going up. Hope to be done with all wall work by the end of the week


Working on the walls.

Working on the electrical outlets where the latest arcade games will be

Small ductwork upstairs in the hallway

View from the upstairs office overlooking the lobby

Upstairs hallway where the projectors will be


Another look down the hallway upstairs. It's ready for sheetrock

Construction Update # 4

The steps going to the upstairs office are now in place


A look at old floor from the meat department at what was once Piggly Wiggly/Food City


Mike standing in what will become a hallway over the entrance


Duct work above the bathrom


Walls going up in the bathroom


A peak at what the bathroom tile


Thursday, August 30, 2007

Construction Update # 3


More workers hanging sheet rock in one of the movie houses


Wind turbines that go on the roof, or at least I think that's where they go.


Not sure what these workers are doing or what they are building


Here's where the steps will go; up to the cinema office


The pre fabed steps just arrived


One of the last times you will see the skeletal outline of a movie house. Soon this will be sheet rocked too!


Looking down the long hallway which has now been completely sheet rocked


High tech sheetrock mover. It's actually a pool table dolly.


Another look at the projector window


Look at all those electrical outlets along the wall. This area is where the games will be


Close up of the electrical outlet


The humble beginnings of an office; a working phone and chair


It's good to know the sheetrock is mold and moisture resistant!

Workers putting up the insulation between the cinema walls