Wednesday, March 5, 2008

Construction Update # 14

The outside poster holders were installed this week

Another shot of the poster holders adorning the outside of the cinema.


The light poster holders really make an impression!


These light poster holders look incredible!

View of the empty poster holders along the wall leading to the concession area

Neat looking shot of the empty poster holders near the box office

The concession counter area isn't complete yet but this shot gives you an idea what it will look like.

Two TV mounts above the concession area were installed last week


Shot of the candy display at the concession counter

The bolts have been drilled and are awaiting arrival of the seats, which should be this week.

Different perspective showing the seat bolts along the concrete floor

This neat little light is mounted above the box office displaying the current movies playing.

Neat shot of the projector to movie house #1


Close up shot of a front projector housing system

Nice shot of the assembled sound equipment racks.

Close up shot of the assembled sound equipment rack

DTS sound equipment boxes


More boxes of sound equipment awaiting installation.


Brand new platters waiting for installation.


These platters are what hold the film in place after it runs through the projector

Platters waiting to be assembled.


Power supplies waiting to be installed


Look at all those breakers!

Friday, February 22, 2008

Construction Update # 13

This is a view of the paint scheme at the new cinema!

This is a view of the paint scheme as you enter the lobby.

View of the paint scheme looking at where the party room is.

Notice the blue decorative lights hanging from the ceiling.

View of the paint scheme where most of the games will be located.

A view of the paint scheme in the hall leading to the cinemas.

Great looking shot of 4 brand new JBL speakers mounted on the wall.

Close up shot of the new JBL speaker mounted on the wall.

I was looking to see if there was by chance an extra speaker in this box for my sound system at home!

One of the bathroom sinks was partially installed.

The bathroom fixtures were custom made.


Culby Supply custom made and installed the concession cabinets this week.

Monday, February 4, 2008

Construction Update # 12

The curtains were installed in each movie house over the weekend.


Shot with the new curtains in the background


Another shot of the curtains in the cinema

Here is a shot of the molding that goes around the new curtains getting a coat of paint



Saturday, January 26, 2008

Seats

We received word this week the seats are ready to be shipped. Here is a transcript of the email:

Hello Micheal These are pictures taken at the factory of a couple of your assembled chairs. Your order is ready to ship. Please email me your theatre address. Thanks Sam
Norton cinema order ready.
Below are some images of the chair samples, More pictures are enclosed for your reference.







Monday, January 21, 2008

Construction Update # 11 Part 2

Just a quick update on the status of our grand opening. We are shooting for a March 1st 2008 . It's possible we could be a week earlier or a week later. As you can see from the latest updates, we are nearing completion in terms of the movie houses. We need to hang the curtains, set the speakers and put down carpet. Then we will be ready for the seats. After that, the houses will be complete. So it's getting closer. We want to thank you for your patience and encourage you to check back often for updates!

Construction Update # 11

Notice the paint around the stadium structure. Next step is hanging the curtains.

View from the floor of the 1st movie house.


Another look at how impressive the movie house looks from floor level.

Notice the small movie houses have 3 surround speakers on each wall.

This week the trees on the bank along the new cinema are being cut down.


Another shot of the locust trees there were cut down on the bank.